STRUCTURAL FABRICATION & ERECTION AT SITE
- Tarini Steels (Daund) – MS Shed 2200 MT.
- Milestone Gear (H.P) – MS Shed 60 MT.
- United Breweries (Dharuhera) – MS Shed 20 MT.
- United Breweries (Kalyani) – MS Shed 17 MT.
- United Breweries (Kalyani) – MS Shed 20 MT.
- Parag Breweries ltd (Carlsberg)–Structural expansion and modification in glycol tank 6 MT.
- United Breweries (Kalyani) – SS Filler Platform 6 MT.
- United Breweries (Kalyani) – SS Platform in entire bottling hall 14 MT.
- Jubilant Agri and Consumer Ltd (Gajraula U.P) – Fabrication and Erection work in LPS Duct, Sulphur Furnace, Boiler Drum, Economizer and in FHE – 25 MT
- Pioneer Distilleries Ltd (Diageo) – SFIP Works, Complete Platform, Railings and Ladders for Safety Department Approx. 100 MT
- Pioneer Distilleries Ltd (Diageo) – Dismantling of Yuva Plant Approx. Weight 100 MT
- Sandvik Asia Material Technology India Pvt ltd (HEC Ranchi) – Chimney Fabrication and Erection Bottom 1500 MM Top 600 MM 60 Mtr Height 2 nos.
PIPES LINE PROJECTS EXECUTED
- Tarini Steels – Overhead, Under Ground and ground level ms, ss pipeline 1700 Mtr approx.
- JP HiTech Casting – Overhead and ground level pipe line APPROX 5000 Mtr.
- Rolex Ring – Hydraulic, pneumatic, overhead and ground level pipe line approx. 2500 Mtr.
- Tarini Steels – LPG pipe line approx. 700 Mt
- Parag Breweries ltd (Carlsberg) – BBT change over trolley beer ss line approx. 650 Mtr and cold insulation in tank and in pipe line.
- Parag Breweries ltd (Carlsberg) – KCX 4 ss pipeline approx. 350 Mtr
- Parag Breweries ltd (Carlsberg) – Fire Hydrant pipe line approx. 1000 Mtr
- United Breweries Ltd (KINGFISHER) – Fabrication & Erection of different size of pipe line from 2’’ To 5’’ Approx. 1800 Mtr.
- United Breweries Ltd (KINGFISHER) – Fire Hydrant pipe line approx. 600 Mt
- United Breweries Ltd (KINGFISHER) – Modification and rerouting of Co2 pipe line in entire process area approx. 1480 Mtr.
- United Breweries Ltd (KINGFISHER) – Modification and complete pipe line changing in APH Approx. 1680 Mtr.
- United Breweries Ltd (KINGFISHER) – Modification and Rerouting of Yeast Pipe line in Process Area Approx. 250 Mtr.
- United Breweries Ltd (KINGFISHER) – Modification and Rerouting of CIP Pipe line in Process Area Approx. 340 MT.
- United Breweries Ltd (KINGFISHER) – Modification and Rerouting of Aldox Glycol Pipe line in Process Area Approx. 250 Mtr.
- United Breweries Ltd (KINGFISHER) – Modification and Rerouting of BEER Pipe line in Process Area Approx. 250 Mtr.
- United Breweries Ltd (KINGFISHER) – Fabrication and Erection of SS Pipe Line of Weak Wort collection tank Approx. 186 Mt.
- United Breweries Ltd (KINGFISHER) – Fabrication and Erection of SS Pipe Line of PVPP Dozer tank Approx. 467 Mtr.
- United Breweries Ltd (KINGFISHER) – Fabrication and Erection of MS Pipe Line For M/s Thermax Condensate Recovery System with Deaerator Approx. 560 Mtr.
- Gorkha Breweries (Nepal) – Fabrication and Erection of MS Pipe Line For M/s Thermax Condensate Recovery System with Deaerator Approx. 285 Mtr.
- Durga Food & Breweries (Frooti, Appy Nepal) – Fabrication and Erection of MS Pipe Line For M/s Thermax Condensate Recovery System with Deaerator Approx. 75 Mtr.
- Mikle Breweries (Odisha) – Fabrication and Erection of Alfa Level food grade SS Pipe Line Approx. 750 Mtr.
- Pioneer Distilleries Ltd (Diageo) – Fire hydrant pipe Line entire Plant approx. 800 Mtr
- HEC Ranchi (Sandvik Project) – Fabrication and Erection of 2000 Kg/Hr Vaporizer With its 950 Mtr Pipe line.
- Pioneer Distilleries Ltd (Diageo) – Fabrication and Erection of Pipe Line in Gena Plant Approx. 450 Mtr.
FURNACE PROJECT EXECUTED
- JP Hi Tech Casting (Rewa) – Electrically Heated Continuous Pusher Furnace.
- JP Hi Tech Casting (Rewa) – Electrically Heated bogie hearth furnace.
- JP Hi Tech Casting (Rewa) – Electrically Heated chamber furnace.
- Tarani Steel (Daund) – LPG Fired Roller Hearth Furnace.
- Milestone Gear (H.P) – Electrically Heated carburizing pit type furnace.
- Mayura Steel (kohlapur) – LPG Fired continuous Pusher furnace.
- Rolex Ring (Rajkot) – Electrically Heated Continuous Pusher Furnace
- Menon Alcop (Kolhapur) – Electrically Heated drop bottom furnace.
- Ekjay Forging (Khapoli) – LPG Fired Continuous Pusher Furnace
- Jubilant Anodizer (Gajrola) – Electrically Heated rotary Roster
- Tarani steels (daund) – LPG Fired Bell furnace
- Hindalco Industries (Aditya Birla Group) Nagpur – Furnace Oil Fired 18 MT aluminum Melting & Holding furnace
- Jindal India (Kolkata) – Electrical heated Foil Annealing furnace
- Hindalco Industries (Aditya Birla Group) Taloja – Electrically Heated Aluminum Slab Tempering furnace
- Hindalco Industries (Aditya Birla Group) Kerala – Electrically Heated 12.8 MT heated Log Homogenizing Furnace.
- Asahi India Glass (Bawal) – Electrically Heated Laminated Furnace 42 Mtr Long Continuous Furnace 1st
- Asahi India Glass (Bawal) – Insulation and mechanical installation of Electrically Heated Laminated Furnace 48 Mtr Long Continuous Furnace.
- Asahi India Glass (Bawal) – Insulation work of Electrically Heated RQ Furnace 54 Mtr Long Continuous Furnace 1st
- Asahi India Glass (Bawal) – Insulation work of Electrically Heated Truck Furnace 20 Mtr Long Continuous Furnace.
- Asahi India Glass (Bawal) – Electrically Heated Laminated Furnace 42 Mtr Long Continuous Furnace 2nd
- Asahi India Glass (Bawal) – Electrically Heated AFX Furnace 54 Mtr Long Continuous Furnace 2nd
- Asahi India Glass (Bawal) – Insulation work of Electrically Heated RQ Furnace 54 Mtr Long Continuous Furnace 2nd
- Asahi India Glass (Bawal) – Insulation work of Electrically Heated RQ Furnace 54 Mtr Long Continuous Furnace 3rd
- Asahi India Glass (Bawal) – Electrically Heated Laminated Furnace 12 Mtr Long Continuous Furnace for Chennai.
- Asahi India Glass (Bawal) – Electrically Heated Print Oven 5 Mtr Long.
- Jay Fe Cylinders Ltd (Bawal) – Erection and Commissioning of Walking Beam Furnace.
MACHINE GUARDING
- United Breweries Ltd (KINGFISHER) Kalyani W.B – 180 Deg and 360 Deg MS and SS Machine, Motor, Coupling, Belt, Chain Guarding.
- United Breweries Ltd (KINGFISHER) Khorda Odisha – 180 Deg and 360 Deg MS and SS Machine, Motor, Coupling, Belt, Chain Guarding.
- United Sprit Ltd (Diageo Pioneer Distilleries Ltd) Dharmabad Maharashtra – 180 Deg and 360 Deg MS and SS Machine, Motor, Coupling, Belt, Chain Guarding
PAINTSHOP LINE AND PRE – TREATMENT LINE
- Atlas cycle (Ludhiana) – Liquid Paint Shop with overhead conveyor.
- Hero cycle (Ludhiana) – Pre-treatment Line with transporter.
- Alfa Cotec (Manesar) – Liquid Paint Shop with overhead conveyor.
- Dewan & Sons Muradabad (U.P) – Powder Coating Line with overhead conveyor and Pre – treatment line with hoist operation.
- VIP (Haridwar) – Powder coating booth with overhead conveyor.
- Faridabad Fabricator (Faridabad) – Powder coating booth with overhead conveyor.
- Radiant Anodiser (Rajasthan) – liquid and Powder coating booth with overhead conveyor.
REVAMPING AND MODIFICATION WORK
- Asahi Glass (Bawal Haryana) – Revamping of Electrically Heated glass Annealing continuous furnace 2 nos.
- Premium Transmission (Kolkata)– Revamping of Electrically Heated Pit Type Furnace 3 Nos.
- JP Hi Tech Casting (Rewa) – Revamping of Electrically Heated Continuous Pusher Furnace hardening and tempering.
- JP Hi Tech Casting (Rewa) – Revamping of Electrically Heated Bogie Hearth Furnace and chamber furnace 2 Nos.
- JP Hi Tech Casting (Rewa) – Revamping of Electrically Heated Chamber Furnace 1 Nos.
- Asahi India Glass (Bawal) – Revamping of Insulation in Autoclave 46 M3 with 13 Bar Pressure.
- Asahi India Glass (Bawal) – Revamping of Insulation in Autoclave 68 M3 13 Bar Pressure.
- Asahi India Glass (Bawal) – Revamping of Insulation in Autoclave 35 M3 13 Bar Pressure.
- Asahi India Glass (Roorkee) – Revamping of Insulation in Autoclave 23 M3 13 Bar Pressure.
- Asahi India Glass (Bawal) – Revamping of Insulation in Electric Heater Lam Furnace 650 KW.
- Sandvik Asia Material Technology India Pvt ltd HEC Ranchi FFP Plant) – Fabrication and Erection of Chimney Bottom Dia 1500 MM Top Dia 600 MM 57 Mtr With internal refractory.
- Sandvik Asia Material Technology India Pvt ltd HEC Ranchi FFP Plant) – Fabrication and Erection of Chimney Bottom Dia 1500 MM Top Dia 600 MM 15 Mtr With internal refractory.
- Asahi India Glass (Bawal) – Revamping of Insulation in Electric Heater IL03 Furnace.
- Asahi India Glass (Bawal) – Revamping of Insulation in Electric Heater IL04 Furnace.
- Asahi India Glass (Bawal) – Revamping of Insulation in Electric Heater IL81 Furnace.
- Asahi India Glass (Bawal) – Revamping and mechanical modification, Insulation in Electric Heater IL06 Furnace.
- Asahi India Glass (Chennai) – Revamping of Insulation in Electric Heater IL07 Furnace.
- Asahi India Glass (Chennai) – Revamping of Insulation in Autoclave 68 M3 13 Bar Pressure.
- Asahi India Glass (Chennai) – Revamping of Insulation in Autoclave 54 M3 13 Bar Pressure.
- Jay Fee Cylinders (Minda group) – Erection and Commissioning of Walking Beam Furnace.
- Mahindra Aerospace Bangalore) – Revamping of Electrically Heated 0.4 MT Solution Annealing Drop Bottom Furnace.
- Asahi India Glass (Chennai) – Revamping of Electric Heater I 81 Furnace.
BOILER AND THEIR PIPELINE ERECTION AND COMMISSIONING ASSISTANCE
- Jubilant group – Waist Heat recovery Boiler 8 TPH Aand There Pipe Line.
- United Breweries Ltd (KINGFISHER) – Husk Boiler 10 TPH pipe line.
- Agro Valley (Nepal Jhapa) – Fabrication, Erection and commissioning of Husk Boiler CBBB 15 with pipe Line and Chimney 60 Mtr.
- Jagdamba Steel (Nepal Bhirjung – Fabrication, Erection and commissioning of Husk Boiler CBBB 40 with pipe Line and Chimney Fabrication & Erection 60 Mtr.
- Bhaskar Herbaceuticals Pvt Ltd (Parwanipur Nepal) – Fabrication, Erection, Pipe line & insulation work of BOP of CB 15/SG multi filter Line and Chimney Fabrication & Erection 90 Mtr.
HOT AND COLD INSULATION AND CLADDING WORK
- Parag Breweries ltd (Carlsberg) – Cold insulation in tank and in pipe line.
- United Breweries Ltd (KINGFISHER) – Hot and cold Insulation work – 800 sqm.
- Parag Breweries ltd (Carlsberg) – Cold insulation IN KCX 4 ss pipe line AND IN TANK.
- Premium Transmission (Kolkata) – Hot Insulation and cladding in furnace ducting approx. Día 500 mm, 15 Mtr.
- Jagdamba Steel (Nepal Bhirjung – Insulation and Cladding of Husk Boiler CBBB 40 with pipe Line.
- Bhaskar Herbaceuticals Pvt Ltd (Parwanipur Nepal) – Insulation and Cladding of BOP of CB 15/SG multi filter Line and Chimney Fabrication & Erection 90 Mtr.
- Hindalco Industries (Aditya Birla Group) Nagpur – Hot Insulation work with cladding in burners ducts TCF.
- Gorkha Breweries (Nepal) – Hot Insulation & Cladding work of MS Pipe Line For M/s Thermax Condensate Recovery System with Deaerator Approx. 285 Mtr.
- Agro Valley (Nepal) – Hot Insulation and Cladding 600 Mtr Approx. Boiler Line.
- Shiv Shakti Ghee (Nepal) – Hot Insulation and Cladding 250 Mtr Approx. Boiler Line.
- OCB Chow Chow Factory (Nepal) – Hot Insulation and Cladding 1750 Mtr Approx. Boiler Line.
- FJM Cylinders (Bawal) – Hot Insulation and Cladding 250 Mtr Approx. Boiler Line.
- OCB Chow Chow Factory (Nepal) – Hot Insulation and Cladding 1750 Mtr Approx. Boiler Line.
- Coca Cola (Kathmandu) – Hot and Cold Insulation and Cladding 2679 Mtr Approx. Boiler Line.
ANNUAL RATE CONTRACT (ARC)
- United Breweries ltd (Dharuhera) Year 2015 – 2016 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Dharuhera) Year 2016 – 2017 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2015 – 2016 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2016 – 2017 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2017 – 2018 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2018 – 2019 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2019 – 2020 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Odisha) Year 2019 – 2020 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2020 – 2021 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- Diageo (PDL) 2020 21 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2021 – 2022 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Sprit Ltd Diageo (PDL) 2021 – 22 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Sprit Ltd Diageo (PDL) 2021 – 22 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Sprit Ltd Diageo (PDL) 2022 – 23 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2022 – 2023 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2023 – 2024 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Sprit Ltd Diageo (PDL) 2023 – 24 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- Asahi India Glass Ltd (Bawal) 2023 – 24 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Breweries ltd (Kalyani) Year 2024 – 2025 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks.
- United Sprit Ltd Diageo (PDL) 2024 – 25 – Fabrication, New Projects, Development and modification of SS and MS structure, pipelines and tanks